SNI PLANT

Delivered a fully integrated Piping engineering design for Specialty chemical facility comprising 460 piping lines across critical process and dedicated utilities with intelligent 3D model of all facilities.

5002 - SNI FREE FLOW PROJECT — Project

Owner

DEEPAK NITRITE LIMITED

Client

DEEPAK NITRITE LIMITED

PMC

--

Location

NANDESARI, INDIA

Project Scope

The Project comprises Brownfield engineering of Piping systems with intelligent 3D modelling for various process systems of process plant with cooling water pumps to support safe, reliable, and efficient operation of the facility while ensuring constructability, maintainability, and optimized plant layout.

Development and finalization of engineering deliverables for procurement, fabrication, construction, and commissioning activities.

Intelligent 3D modelling covering the complete process units and dedicated utilities.

Performed pipe stress analysis considering Thermal expansion and sustained loads, Operating conditions and flexibility requirements.

Major facilities include process facility of G+3 structure along with cooling water pumps and interconnecting rack.

Engineering activities include piping routing, piping layout development, critical line stress analysis, utility integration and multidisciplinary coordination.

Intelligent 3D model utilized for equipment positioning, routing optimization, clash detection, constructability review, and interdisciplinary coordination.

Engineering execution focused on safe operation, optimized plant layout, maintainability, accessibility, structural integrity, and efficient project execution.

Deliverables developed in compliance with applicable engineering standards, codes, and project specifications.

Key Highlights

Successfully executed Detail engineering of Piping systems, Intelligent 3D modeling and Piping Stress analysis with 460 No. of lines, 90 No. of equipment and plot area 1182.5 m2.

Engineered process facility within G+3 process structure with Footprint of 28 m × 18 m and Height of 27 m.